River Installation 400 tm/h to Corbeil

Actu Corbeil
12/04/2014
Today, Denis have developed a range of handling equipment capable of reaching 400 metrics tons per hour ...

 

Different equipments, chain conveyor, bucket elevator and conveyor belt are already put into service for a river facility in Corbeil Essonne.

This installation aims at stepping over the expressway by welcoming on one side trucks and to make on the other side the load of barges.

 

Search a contact

Last search